New World Survival · Community Garden Field Manual
Resilience & Continuity Workbook
Reduce the garden to safe essential functions during heat, drought, irrigation failure, flooding or extended absence, then restart with a documented recovery review.
Core rule: Preserving every crop is not the goal. People, safe water, food-safety boundaries, critical access and clear authority come first.
1. Continuity leadership
Landowner / sponsor contact
2. Critical systems map
Mark water source/shutoff, irrigation zones, main routes, gates, shed, electrical if present, flood-prone areas, donation/harvest staging, safe weather shelter and emergency access.
3. Minimum viable garden matrix
| System | Must remain functional? | Minimum task | Owner | What pauses first? |
| People/site safety | ☐ | | | |
| Water source/shutoff | ☐ | | | |
| Priority crops | ☐ | | | |
| Harvest/food safety | ☐ | | | |
| Routes/gates | ☐ | | | |
| Donation commitments | ☐ | | | |
| Communication | ☐ | | | |
4. Trigger / action table
| Trigger | Source/threshold | Prewritten action | Who decides | Who must be told |
|---|
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
5. Heat / lightning plan
Safe substantial building / hard-topped vehicle Tasks that become lighter/shorter
6. Drought / restriction record
| Date | Drought/utility stage | Actual watering rule | Source/link/contact | Garden change |
|---|
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
7. Crop water-triage worksheet
| Bed/crop | Established/new? | Crop stage | Root volume/container? | Replaceability | Commitment | Priority/action |
|---|
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
8. Water-demand reduction checklist
☐ Leaks repaired / zones isolated
☐ Root-zone moisture checked before extra watering
☐ New planting paused if establishment cannot be supported
☐ Ripe crops harvested
☐ Water-competing weeds prioritized
☐ Mulch condition reviewed
☐ Container shade/grouping reviewed where appropriate
☐ Donation crop commitments revised if needed
9. Irrigation failure / outage card
Source safe to use?
☐ yes ☐ no ☐ unknown
Shutoff / isolation instruction Priority beds during outage
10. Alternate-water verification
| Source | Intended crop/use | Quality/testing | Local rule | Approved by | Status |
|---|
| | | | | ☐ approved ☐ investigate ☐ stop |
| | | | | ☐ approved ☐ investigate ☐ stop |
| | | | | ☐ approved ☐ investigate ☐ stop |
| | | | | ☐ approved ☐ investigate ☐ stop |
| | | | | ☐ approved ☐ investigate ☐ stop |
| | | | | ☐ approved ☐ investigate ☐ stop |
| | | | | ☐ approved ☐ investigate ☐ stop |
| | | | | ☐ approved ☐ investigate ☐ stop |
11. Extended Absence Coverage Card
Primary / backup caretaker Current water restriction Priority beds / root-zone method
12. Backup decision rights
| Decision | Backup may decide? | Call first? | Rule / limit |
| Shut off irrigation | ☐ yes ☐ no | | |
| Change irrigation runtime | ☐ yes ☐ no | | |
| Harvest ripe produce | ☐ yes ☐ no | | |
| Donate planned produce | ☐ yes ☐ no | | |
| Suspend workday/event | ☐ yes ☐ no | | |
| Close flooded bed/area | ☐ yes ☐ no | | |
| Remove failed crop | ☐ yes ☐ no | | |
| Contact landowner/utility | ☐ yes ☐ no | | |
13. Flood event record
Date / water source if known High-water time / duration Possible contamination sources | Bed/crop | Edible portion contacted? | Underground crop in flooded soil? | Marked/segregated? | Disposition |
|---|
| ☐ yes ☐ no ☐ unknown | ☐ | ☐ | |
| ☐ yes ☐ no ☐ unknown | ☐ | ☐ | |
| ☐ yes ☐ no ☐ unknown | ☐ | ☐ | |
| ☐ yes ☐ no ☐ unknown | ☐ | ☐ | |
| ☐ yes ☐ no ☐ unknown | ☐ | ☐ | |
| ☐ yes ☐ no ☐ unknown | ☐ | ☐ | |
| ☐ yes ☐ no ☐ unknown | ☐ | ☐ | |
| ☐ yes ☐ no ☐ unknown | ☐ | ☐ | |
| ☐ yes ☐ no ☐ unknown | ☐ | ☐ | |
| ☐ yes ☐ no ☐ unknown | ☐ | ☐ | |
14. Flood cleanup / exposure controls
☐ Site entry declared safe enough for garden cleanup
☐ Vulnerable people kept away until hazards addressed
☐ Gloves/closed footwear/other appropriate protection used
☐ Flood-affected plant residue kept out of ordinary garden compost
☐ Tools cleaned
☐ Clothing/shoes managed to avoid tracking contaminants indoors
☐ Irrigation source checked if affected
☐ Chemical-contaminant testing question routed appropriately
15. Post-flood replant verification
| Question | Finding / source | Who advised | Decision |
| Edible crop area cleared for replant? | | | |
| Likely chemical contaminants identified? | | | |
| Soil test needed / correct analyte? | | | |
| Irrigation water safe? | | | |
| Local/state/Extension replant timing? | | | |
| Unflooded areas protected from cross-contamination? | | | |
Do not enter a universal number of waiting days. Record the event-specific guidance.
16. Donation / harvest continuity
| Commitment | Can quality/safety still be met? | Continue / reduce / suspend | Recipient notified? | Backup plan |
|---|
| ☐ | | ☐ | |
| ☐ | | ☐ | |
| ☐ | | ☐ | |
| ☐ | | ☐ | |
| ☐ | | ☐ | |
| ☐ | | ☐ | |
| ☐ | | ☐ | |
| ☐ | | ☐ | |
17. Communication log
| Date/time | Status / decision | Audience | Channel | Sent by | Needs follow-up? |
|---|
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
18. Restart inspection
☐ Site safe to enter
☐ Water source / advisory status verified
☐ Irrigation system inspected and calibrated
☐ Routes/gates/access restored
☐ Flood-affected food disposition resolved
☐ Soil/water testing questions resolved
☐ Tool/storage condition checked
☐ Donation/recipient commitments reset
☐ Gardeners told what is open/closed
19. After-action review
| Question | Finding | Change before next season |
| What failed first? | | |
| Which system had one-person dependency? | | |
| What used the most water/labor? | | |
| What crop could have been paused earlier? | | |
| What source/contact was missing? | | |
| What communication worked best? | | |
| What safety stop worked? | | |
| What should be simplified? | | |
20. Annual continuity handoff
☐ Decision lead and backup current
☐ Critical systems map current
☐ Water/shutoff/repair contacts current
☐ Drought restriction source current
☐ Flood-prone areas marked
☐ Safe weather shelter confirmed
☐ Alternate water sources verified or explicitly not approved
☐ Absence Coverage Card tested
☐ Donation continuity plan current
☐ Incoming steward can run the minimum viable garden without verbal help
First three continuity improvements for the incoming steward