New World Survival · Community Garden Field Manual
Shared Infrastructure Inspection Binder
Track paths, beds, fences, gates, water-adjacent infrastructure, sheds, signs, seating, drainage and repairs from first defect through closeout and handoff.
Two decisions for every finding: condition = Healthy / Watch / Correct / Stop. Work class = Maintain / Repair / Replace / Project Change.
2. Infrastructure map
Mark property boundaries if known, paths, gates, beds, water points, shutoff, shed/storage, signs, seating, shelters, compost/bulk materials, drainage problem areas and required emergency/service access.
3. Asset register
| ID | Asset | Location | Owner/responsibility | Install/known age | Condition | Next inspection |
|---|
| | | | | ☐ H ☐ W ☐ C ☐ S | |
| | | | | ☐ H ☐ W ☐ C ☐ S | |
| | | | | ☐ H ☐ W ☐ C ☐ S | |
| | | | | ☐ H ☐ W ☐ C ☐ S | |
| | | | | ☐ H ☐ W ☐ C ☐ S | |
| | | | | ☐ H ☐ W ☐ C ☐ S | |
| | | | | ☐ H ☐ W ☐ C ☐ S | |
| | | | | ☐ H ☐ W ☐ C ☐ S | |
| | | | | ☐ H ☐ W ☐ C ☐ S | |
| | | | | ☐ H ☐ W ☐ C ☐ S | |
| | | | | ☐ H ☐ W ☐ C ☐ S | |
| | | | | ☐ H ☐ W ☐ C ☐ S | |
| | | | | ☐ H ☐ W ☐ C ☐ S | |
| | | | | ☐ H ☐ W ☐ C ☐ S | |
| | | | | ☐ H ☐ W ☐ C ☐ S | |
| | | | | ☐ H ☐ W ☐ C ☐ S | |
4. Dry-weather path inspection
| Route segment | Surface | Width/encroachment | Trip/edge | Grade issue | Condition/action |
|---|
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
5. Wet-weather / irrigation path inspection
| Date/condition | Segment | Ponding/mud | Erosion/sediment | Loose/deep material | Action |
|---|
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
6. Accessible-route maintenance check
☐ Required route remains clear
☐ Surface remains firm/stable/slip resistant where required
☐ Hoses/tools/materials removed from route
☐ Gate/entrance remains usable
☐ Seasonal vegetation has not narrowed route
☐ Temporary repair interruption documented/alternative addressed as required
7. Raised-bed / planter inspection
| Bed ID | Walls/corners | Fasteners | Rot/corrosion | Soil spill/slump | Access issue | Disposition |
|---|
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
8. Bed material / replacement record
| Bed | Existing material | Known treated? | Replacement material/source | Disposal guidance | Approval |
|---|
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
9. Fence inspection
| Segment | Purpose | Posts | Panels/wire | Sharp/protruding | Animal/security gap | Action |
|---|
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
10. Gate inspection
| Gate | Hinge/post | Latch/lock | Clear route | Ground drag | Weather issue | Action |
|---|
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
11. Water-adjacent infrastructure
| Point | Leak | Shutoff known? | Approach/mud | Erosion | Freeze exposure | Escalation? |
|---|
| | ☐ | | | | |
| | ☐ | | | | |
| | ☐ | | | | |
| | ☐ | | | | |
| | ☐ | | | | |
| | ☐ | | | | |
| | ☐ | | | | |
| | ☐ | | | | |
12. Shed/storage inspection
| Element | Leak/moisture | Rot/corrosion | Loose/unstable | Blocks access? | Action |
| Roof | | | | | |
| Door/lock | | | | | |
| Walls/floor | | | | | |
| Shelves/racks | | | | | |
| Lighting/electrical if present | | | | | |
13. Signs, seats, shelters and bulletin boards
| Asset | Readable/current? | Stable? | Loose hardware? | Approach usable? | Action |
|---|
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
14. Drainage / erosion incident map
Mark where water enters, ponds, channels, deposits sediment, undermines paths/beds, or leaves the site. Do not design new drainage from this sketch alone.
15. Utility / permit / approval gate
| Proposed work | Digging? | 811/state process | Landowner | Permit/code | Accessibility | Proceed? |
|---|
| ☐ | | | | | ☐ P ☐ I ☐ Stop |
| ☐ | | | | | ☐ P ☐ I ☐ Stop |
| ☐ | | | | | ☐ P ☐ I ☐ Stop |
| ☐ | | | | | ☐ P ☐ I ☐ Stop |
| ☐ | | | | | ☐ P ☐ I ☐ Stop |
| ☐ | | | | | ☐ P ☐ I ☐ Stop |
| ☐ | | | | | ☐ P ☐ I ☐ Stop |
| ☐ | | | | | ☐ P ☐ I ☐ Stop |
16. Repair backlog
| ID | Finding | Condition | Work class | Owner | Due | Cost/source | Status |
|---|
| | ☐ H ☐ W ☐ C ☐ S | ☐ M ☐ R ☐ Replace ☐ Project | | | | |
| | ☐ H ☐ W ☐ C ☐ S | ☐ M ☐ R ☐ Replace ☐ Project | | | | |
| | ☐ H ☐ W ☐ C ☐ S | ☐ M ☐ R ☐ Replace ☐ Project | | | | |
| | ☐ H ☐ W ☐ C ☐ S | ☐ M ☐ R ☐ Replace ☐ Project | | | | |
| | ☐ H ☐ W ☐ C ☐ S | ☐ M ☐ R ☐ Replace ☐ Project | | | | |
| | ☐ H ☐ W ☐ C ☐ S | ☐ M ☐ R ☐ Replace ☐ Project | | | | |
| | ☐ H ☐ W ☐ C ☐ S | ☐ M ☐ R ☐ Replace ☐ Project | | | | |
| | ☐ H ☐ W ☐ C ☐ S | ☐ M ☐ R ☐ Replace ☐ Project | | | | |
| | ☐ H ☐ W ☐ C ☐ S | ☐ M ☐ R ☐ Replace ☐ Project | | | | |
| | ☐ H ☐ W ☐ C ☐ S | ☐ M ☐ R ☐ Replace ☐ Project | | | | |
| | ☐ H ☐ W ☐ C ☐ S | ☐ M ☐ R ☐ Replace ☐ Project | | | | |
| | ☐ H ☐ W ☐ C ☐ S | ☐ M ☐ R ☐ Replace ☐ Project | | | | |
| | ☐ H ☐ W ☐ C ☐ S | ☐ M ☐ R ☐ Replace ☐ Project | | | | |
| | ☐ H ☐ W ☐ C ☐ S | ☐ M ☐ R ☐ Replace ☐ Project | | | | |
17. Repair closeout record
| Date | Item | Work done | Material/part | By whom | Approved/inspected | Recheck date |
|---|
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
18. Replacement / reserve plan
| Asset | Why replacement likely | Priority | Rough budget | Reserve/funding | Target season |
|---|
| | ☐ high ☐ med ☐ low | | | |
| | ☐ high ☐ med ☐ low | | | |
| | ☐ high ☐ med ☐ low | | | |
| | ☐ high ☐ med ☐ low | | | |
| | ☐ high ☐ med ☐ low | | | |
| | ☐ high ☐ med ☐ low | | | |
| | ☐ high ☐ med ☐ low | | | |
| | ☐ high ☐ med ☐ low | | | |
| | ☐ high ☐ med ☐ low | | | |
| | ☐ high ☐ med ☐ low | | | |
19. Seasonal infrastructure health audit
| System | Healthy | Watch | Correct | Stop | Owner / next action |
| Paths/drainage | ☐ | ☐ | ☐ | ☐ | |
| Accessible features | ☐ | ☐ | ☐ | ☐ | |
| Beds/plot edges | ☐ | ☐ | ☐ | ☐ | |
| Fences/gates | ☐ | ☐ | ☐ | ☐ | |
| Water-adjacent | ☐ | ☐ | ☐ | ☐ | |
| Shed/storage | ☐ | ☐ | ☐ | ☐ | |
| Signs/seating/shelter | ☐ | ☐ | ☐ | ☐ | |
| Repair reserve | ☐ | ☐ | ☐ | ☐ | |
20. Steward handoff
☐ Site/infrastructure map current
☐ Open Stop conditions isolated
☐ Repair backlog assigned
☐ Utility/permit contacts locatable
☐ Water shutoff record current
☐ Replacement reserve priorities documented
☐ Warranties/manuals/material records retained
☐ Next wet-weather inspection scheduled
First three actions for incoming steward