New World Survival · Community Garden Field Manual

Shared Infrastructure Inspection Binder

Track paths, beds, fences, gates, water-adjacent infrastructure, sheds, signs, seating, drainage and repairs from first defect through closeout and handoff.

Two decisions for every finding: condition = Healthy / Watch / Correct / Stop. Work class = Maintain / Repair / Replace / Project Change.

1. Site and authority

Garden / address
Landowner
Infrastructure steward
Repair approval contact

2. Infrastructure map

Mark property boundaries if known, paths, gates, beds, water points, shutoff, shed/storage, signs, seating, shelters, compost/bulk materials, drainage problem areas and required emergency/service access.

3. Asset register

IDAssetLocationOwner/responsibilityInstall/known ageConditionNext inspection
☐ H ☐ W ☐ C ☐ S
☐ H ☐ W ☐ C ☐ S
☐ H ☐ W ☐ C ☐ S
☐ H ☐ W ☐ C ☐ S
☐ H ☐ W ☐ C ☐ S
☐ H ☐ W ☐ C ☐ S
☐ H ☐ W ☐ C ☐ S
☐ H ☐ W ☐ C ☐ S
☐ H ☐ W ☐ C ☐ S
☐ H ☐ W ☐ C ☐ S
☐ H ☐ W ☐ C ☐ S
☐ H ☐ W ☐ C ☐ S
☐ H ☐ W ☐ C ☐ S
☐ H ☐ W ☐ C ☐ S
☐ H ☐ W ☐ C ☐ S
☐ H ☐ W ☐ C ☐ S

4. Dry-weather path inspection

Route segmentSurfaceWidth/encroachmentTrip/edgeGrade issueCondition/action

5. Wet-weather / irrigation path inspection

Date/conditionSegmentPonding/mudErosion/sedimentLoose/deep materialAction

6. Accessible-route maintenance check

☐ Required route remains clear
☐ Surface remains firm/stable/slip resistant where required
☐ Hoses/tools/materials removed from route
☐ Gate/entrance remains usable
☐ Seasonal vegetation has not narrowed route
☐ Temporary repair interruption documented/alternative addressed as required

7. Raised-bed / planter inspection

Bed IDWalls/cornersFastenersRot/corrosionSoil spill/slumpAccess issueDisposition

8. Bed material / replacement record

BedExisting materialKnown treated?Replacement material/sourceDisposal guidanceApproval

9. Fence inspection

SegmentPurposePostsPanels/wireSharp/protrudingAnimal/security gapAction

10. Gate inspection

GateHinge/postLatch/lockClear routeGround dragWeather issueAction

11. Water-adjacent infrastructure

PointLeakShutoff known?Approach/mudErosionFreeze exposureEscalation?

12. Shed/storage inspection

ElementLeak/moistureRot/corrosionLoose/unstableBlocks access?Action
Roof
Door/lock
Walls/floor
Shelves/racks
Lighting/electrical if present

13. Signs, seats, shelters and bulletin boards

AssetReadable/current?Stable?Loose hardware?Approach usable?Action

14. Drainage / erosion incident map

Mark where water enters, ponds, channels, deposits sediment, undermines paths/beds, or leaves the site. Do not design new drainage from this sketch alone.

15. Utility / permit / approval gate

Proposed workDigging?811/state processLandownerPermit/codeAccessibilityProceed?
☐ P ☐ I ☐ Stop
☐ P ☐ I ☐ Stop
☐ P ☐ I ☐ Stop
☐ P ☐ I ☐ Stop
☐ P ☐ I ☐ Stop
☐ P ☐ I ☐ Stop
☐ P ☐ I ☐ Stop
☐ P ☐ I ☐ Stop

16. Repair backlog

IDFindingConditionWork classOwnerDueCost/sourceStatus
☐ H ☐ W ☐ C ☐ S☐ M ☐ R ☐ Replace ☐ Project
☐ H ☐ W ☐ C ☐ S☐ M ☐ R ☐ Replace ☐ Project
☐ H ☐ W ☐ C ☐ S☐ M ☐ R ☐ Replace ☐ Project
☐ H ☐ W ☐ C ☐ S☐ M ☐ R ☐ Replace ☐ Project
☐ H ☐ W ☐ C ☐ S☐ M ☐ R ☐ Replace ☐ Project
☐ H ☐ W ☐ C ☐ S☐ M ☐ R ☐ Replace ☐ Project
☐ H ☐ W ☐ C ☐ S☐ M ☐ R ☐ Replace ☐ Project
☐ H ☐ W ☐ C ☐ S☐ M ☐ R ☐ Replace ☐ Project
☐ H ☐ W ☐ C ☐ S☐ M ☐ R ☐ Replace ☐ Project
☐ H ☐ W ☐ C ☐ S☐ M ☐ R ☐ Replace ☐ Project
☐ H ☐ W ☐ C ☐ S☐ M ☐ R ☐ Replace ☐ Project
☐ H ☐ W ☐ C ☐ S☐ M ☐ R ☐ Replace ☐ Project
☐ H ☐ W ☐ C ☐ S☐ M ☐ R ☐ Replace ☐ Project
☐ H ☐ W ☐ C ☐ S☐ M ☐ R ☐ Replace ☐ Project

17. Repair closeout record

DateItemWork doneMaterial/partBy whomApproved/inspectedRecheck date

18. Replacement / reserve plan

AssetWhy replacement likelyPriorityRough budgetReserve/fundingTarget season
☐ high ☐ med ☐ low
☐ high ☐ med ☐ low
☐ high ☐ med ☐ low
☐ high ☐ med ☐ low
☐ high ☐ med ☐ low
☐ high ☐ med ☐ low
☐ high ☐ med ☐ low
☐ high ☐ med ☐ low
☐ high ☐ med ☐ low
☐ high ☐ med ☐ low

19. Seasonal infrastructure health audit

SystemHealthyWatchCorrectStopOwner / next action
Paths/drainage
Accessible features
Beds/plot edges
Fences/gates
Water-adjacent
Shed/storage
Signs/seating/shelter
Repair reserve

20. Steward handoff

☐ Site/infrastructure map current
☐ Open Stop conditions isolated
☐ Repair backlog assigned
☐ Utility/permit contacts locatable
☐ Water shutoff record current
☐ Replacement reserve priorities documented
☐ Warranties/manuals/material records retained
☐ Next wet-weather inspection scheduled

First three actions for incoming steward