New World Survival · Facility tool

Community Support Site Facility Assessment Workbook

Assess one proposed service through authority, approach, access, utilities, operations, capacity and closure.

Use with local officials, the insurer, disability-led reviewers and the proposed operating partner.

Assessment record

1. Name the exact proposed use

Institution and address
Assessment date
Proposed service
Rooms and exterior areas
Operating hours
Proposed capacity
Institutional authority
Operating partner

Review team

2. Record who walked the complete service path

ReviewerOrganization or roleArea reviewedFollow-up authority

Approach and entry

3. Walk from the public route to check-in

ElementObserved conditionCorrectionOwnerRequired before opening
Road and responder access
Transit, drop-off and parking
Accessible exterior route
Lighting and wayfinding
Entrance and door operation
Queue and weather protection

Life safety and utilities

4. Verify the systems the service depends on

SystemNormal statusDisruption statusQualified reviewerStop condition
Occupancy and exits: two ways out of the room, doors that open from inside without a key
Alarm, lighting and fire protection
Electrical service and critical loads
Portable generator spot: outside only, never in the building or a garage, at least 20 feet from every door, window and air intake, exhaust facing away
Carbon monoxide alarms with battery power or battery backup. If an alarm sounds, treat it as suspected carbon monoxide poisoning: everyone outside to fresh air, then call 911
Safe water and toilets
Sewage, cleaning and waste
Heating, cooling and ventilation
Phone, internet and public address

Service area

5. Lay out the operation

Check-in and queue
Primary service zone
Accessible seating and communication
Private conversation area
Supplies, loading and waste
Staff, breaks and restricted areas

Capacity

6. Set limits the team can manage

Fire or code limit
Operational capacity
Reduced capacity
Closing threshold
Minimum staffing
Supply or utility limit

How people entering and leaving will be counted

Restricted areas and restoration

7. Protect the rest of the institution

Cleaning, damage, inventory and return-to-use plan

Corrections

8. Close every condition before opening

FindingCorrectionOwnerDueVerified by and date

Verdict

9. Approve the service at the right level

Approved service, rooms, hours and capacity

Opening, reduction, closure and transfer conditions

Institutional approval
Date
Operating partner
Next review
Do not generalize the verdict.

Approval applies only to the named service, rooms, conditions, capacity and operating arrangement.